Response to LGOIMA request 2024 210 6 September 2024
Search in document libraryRequested Information:
“We request the following information, from January 2022 to date [for funding of Metlink toilet prototypes]:
• A detailed timeline of the project including how long the project is expected to take from here on out (the 23rd of August 2024).
• Receipts and a breakdown of all costs related to the designing of the driver toilet prototypes, including but not limited to:
o Artist rendering for the Wilton toilet
o Artist rendering for the Karori toilet
o Artist rendering costs for any other toilets
• A breakdown of all projected costs related to the installation of the toilets, including materials, labour, and any other expenses.
• The locations in question are:
o Stop 4128/5128 at the Mairangi/Wilton terminus
o Stop 4947 at the Highbury terminus
o Stop 7338 at the Lyall Bay terminus
o Stop 6937 at the Houghton Bay terminus
o Stop 5332 at the Karori Park terminus
o Stop 7241 on Darlington Road, Miramar
o Any other stops relevant to the nature of this request”