Hutt Corridor Transport Options Stage 1: Economic Evaluation of Stage 1
Search in document libraryThis briefing note looks at and compares three sets of options
that are being considered as part of the Hutt Corridor Transport
Study. Those 3 sets of options are based on a set of State
Highway 2 (SH 2) roading options, a set of public transport
options and a set of options for a cross-valley road link and
associated/connected road link to the Transmission Gully
Motorway.
This is stage one of the evaluation and is a coarse sieve, with
more complete analysis scheduled once the options have been
narrowed down.