Opus International Consultants Limited (Opus) and Arup Australia (Arup) were commissioned by Greater Wellington Regional Council (GWRC) to rebase the existing 2006 Wellington Transport Strategy Model (WTSM) to a new…
Opus International Consultants Limited (Opus) and Arup Australia (Arup) were commissioned by Greater Wellington Regional Council (GWRC) to rebase the existing 2006 Wellington Transport Strategy Model (WTSM) to a new…
Opus International Consultants Limited (Opus) and Arup Australia (Arup) were commissioned by Greater Wellington Regional Council (GWRC) to rebase the existing 2006 Wellington Transport Strategy Model (WTSM) to a new…
Opus International Consultants Limited (Opus) and Arup Australia (Arup) were commissioned by Greater Wellington Regional Council (GWRC) to rebase the existing 2006 Wellington Transport Strategy Model (WTSM) to a new…
This technical note describes the cleaning and analysis of the rail intercept surveys that were carried out by TDG and Research NZ as part of the Wellington Public Transport Model…
There is no digital version of this document available, but you can get in touch with publications@gw.govt.nz to get a copy of the document.
alarm Published 31 Dec 2013The Wellington Transport Strategic Model (WTSM) and the Wellington Public Transport Model (WPTM) are the modelling tools that have been updated / developed for Greater Wellington Regional Council (GWRC). The…
This document outlines correspondence between applicant and GWRC regarding resource consent WGN130085 [31970].
This document outlines correspondence between applicant and GWRC regarding resource consent WGN130085 [31970].
This document outlines correspondence between applicant and GWRC regarding resource consent WGN130085 [31970].
Poster outlining events being held at regional parks and
forests for Summer 2013.