Policies supporting the Long Term Plan 2015-25 (also called the 10 Year Plan) are found here.
This report is a technical assessment report to support an application to renew a groundwater take consent (resource consent: WGN160011 [33583]).
This technical note documents the validation of the Wellington Transport Strategy Model (WTSM) as part of the 2013 update of the model.
Link to report prepared in July 2015 for GWRC by LWP as part of the draft Natural Resources Plan process
WHEN: July 1 2015 4:00pm – 8:00pm
WHERE: Greytown Community Library
This is the original resource consent application for WGN160011 [33583].
This paper looks at the value of pursuing flood protection options that are flexible, rather than adopting a single solution that cannot be adapted to deal with changing and unpredictable external…